In many process plants, equipment changeovers (the time to switch from one product to the next) are 100% non-value-added downtime. Reducing these changeovers through Lean SMED techniques frees up capacity, enabling more production time and smaller batches. By converting setup steps into ones that can be done while equipment is running, then streamlining what remains, SMED targets setup times in the “single-digit minutes”.